Furniture removed, pews out and stored, floorboards removed and the excavation started

The mini digger made short work of the excavation.

The concrete base, poured and set

Tiles removed from the roof and a new waterproof membrane installed.

Insulation panels on the floor with underfloor heating pipes in place.

Screed being poured on to the insulation and heating pipes.

The screed deployed and dried.

The remaining wall panels have been removed, preparations made to relocate the bi-fold doors and the electrical installation is underway.